Wandering Knight

#34: North Country Trail Spring Maintenance 2014

Informações:

Synopsis

On the weekend of April 11, 2014 Andy, Elwira, John and I went out to do our spring trail maintenance. Our section of North Country Trail runs from 13 Mile Road to 16 Mile Road (Newago County, Michigan) and includes the side trail to Highbank Lake Campground. All told this is about 6.4 miles of trail that passes by several lakes rising and falling through many gentle short climbs. This weekend will be remembered for the great thunderstorm that ripped through the area Saturday night and Sunday morning. Besides the hail and very heavy flood causing rains the storm brought gale force winds that likely hit speeds around 60MPH and brought down numerous trees. Sadly I suspect the section of trail we had worked on Saturday likely has new trees down that we couldn't get back too. We certainly found downed trees that had not been there on the Highbank Lake campground side trail Sunday afternoon. Since we have a nearly four-hour drive to get to our section campsite located just south of Cedar Creek on FR 5311 not to me